Energy Storage Battery New National Standard & Global Certification Guide (2024)

SRC-TEST
Energy Storage Battery New National Standard & Global Certification Guide (2024)

Energy Storage Battery New National Standard & Global Certification Guide (2024)

2025.11.04

This article analyzes the core changes in GB/T 36276-2023, compares it with the 2018 version, and summarizes test items, lead times, and certification requirements in major global markets.

GB/T 36276-2023 Key Changes:

Aspect2018 Version2023 Version
Cell tests19 items, 28 samples18 items, 33 samples
Module tests19 items, 8 samples23 items, 11 samples
Cluster tests4 items, 1 sample8 items, 1 sample

Major Updates:

  • Added high-altitude initial charge/discharge and power characteristic tests
  • Added overload safety tests (replaced 4C rate test)
  • Unified cycling: 1000 cycles at 45°C (no longer distinguishing energy/power types)
  • Increased crush force from 13kN to 50kN
  • Added liquid cooling pipe pressure test for modules and clusters

Lead Time & Samples:

ProductLead TimeSamples
Cell8 months28+4 pcs
Module (air-cooled)5 months9 sets
Module (liquid-cooled)6 months9 sets
Cluster1 month1 set

Global Certifications:

  • China: GB 40165, GB/T 36276, GB/T 36280
  • EU: IEC 62619, IEC 62620, IEC 63056, CE-EMC, ROHS
  • North America: UL 1973, UL 9540, UL 9540A, FCC, IC
  • Japan: S-Mark (JIS C 8715)
  • Korea: KC 62619
  • Australia: CEC listing, C-Tick
  • Transport: UN 38.3